🇺🇸 100% MADE IN USA • ICC-ES ESR-1812 APPROVED

Jobsite Lumber & Labor Savings Calculator

Eliminate corner studs and deadwood backup. Made daily in Hot Springs, Arkansas since 1978!

⚡ Quick Blueprints:

1 Project Framing Details

Saves 1 stud each
corners
Standard 90° corners on exterior & interior walls
Saves 2 studs each
partitions
Where interior dividing walls meet perpendicular walls
Eliminates deadwood
lin. ft
Total linear feet of wood backing replaced by fasteners

2 Lumber & Labor Rates

$
$
$
ESTIMATED NET JOB SAVINGS
$387.64

Net return after subtracting all fastener material costs.

🌲 Studs Eliminated Lumber eliminated from corners & deadwood
42 studs
💵 Lumber Material Saved 42 studs × $5.50
$231.00
⏱️ Labor Hours Recovered 5 min saved per stud eliminated (6m vs 1m)
3.50 hrs
👷 Framing Labor Saved 3.50 hrs × $45.00/hr
$157.50
📦 Fasteners Needed (approx) 6 clips per stud eliminated
252 clips
🏷️ Fastener Investment 252 clips × $0.19
-$47.88
RECOMMENDED FOR THIS BUILD
1× 300-Pack Box (includes jobsite reserve)
📋 Download ICC-ES ESR-1812

Engineering & Code Note: Prest-On fasteners are fully code-compliant under ICC-ES ESR-1812, tested under ASTM E72-80 for structural adequacy, and Warnock Hersey listed for 1 & 2-hour fire-rated assemblies. Saves carpentry, electrical, and HVAC installation time while reducing costly drywall callbacks from seasonal truss movement.