Jobsite Lumber & Labor Savings Calculator
Eliminate corner studs and deadwood backup. Made daily in Hot Springs, Arkansas since 1978!
1 Project Framing Details
Saves 1 stud each
corners
Standard 90° corners on exterior & interior walls
Saves 2 studs each
partitions
Where interior dividing walls meet perpendicular walls
Eliminates deadwood
lin. ft
Total linear feet of wood backing replaced by fasteners
2 Lumber & Labor Rates
$
$
$
ESTIMATED NET JOB SAVINGS
$387.64
Net return after subtracting all fastener material costs.
Studs Eliminated
Lumber eliminated from corners & deadwood
42 studs
Lumber Material Saved
42 studs × $5.50
$231.00
Labor Hours Recovered
5 min saved per stud eliminated (6m vs 1m)
3.50 hrs
Framing Labor Saved
3.50 hrs × $45.00/hr
$157.50
Fasteners Needed (approx)
6 clips per stud eliminated
252 clips
Fastener Investment
252 clips × $0.19
-$47.88
RECOMMENDED FOR THIS BUILD
1× 300-Pack Box (includes jobsite reserve)